Pro Clima Solitex UM connect Wrap
Pro Clima Solitex UM connect weather resistive barrier wrap
Pro Clima Solitex® UM connect stands as a weather-resistant barrier with an integrated 3D separation layer and self-adhesive strips. It is versatile and applicable to both ventilated and unventilated structures, compatible with a wide range of metal roofing and wall cladding materials. Featuring a non-porous, water-resistant TEEE film, it is securely laminated between two layers of spun-bonded polypropylene at high temperatures. This product is well-suited for metal roof applications, meeting the requirements for use in BAL regions spanning from 12.5 to 40 in accordance with AS 3959. Additionally, it can be employed in wall applications behind various cladding materials.Benefits of Solitex UM connect vapour permeable roof wrap
- 3D separation layer provides ventilation between roof/wall and the weather resistive barrier (WRB)
- Highly vapour permeable (Class 4)
- Weathertight and airtight weather resistive barrier (WRB)
- Helps protect building from condensation
5 tips on installing Pro Clima
Request a quote
Pro Clima Solitex UM connect Wrap
Thanks, your request is on its way.
We’ll get back to you with pricing within one business hour.
Roofs (over solid sheathing)
Summarised from the pro clima SOLITEX UM Application Instructions, roof and wall (AUS, 13.01.2019). Work from the full guide: it has the drawings and every detail. Open the full guide (PDF)
- Remove all nails, screws, splinters and anything else that could damage the membrane.
- Clean the sheathing with a rag, broom or vacuum and make sure it is free of silicones and grease.
- Mark a level horizontal line up from the drip edge for the overhang you want, and mark starting points for valleys, barges, dormers and walls.
- Roll out the membrane with the 3D mesh facing up, taut and without wrinkles, leaving at least 50mm overlap at junctions.
- Staple with galvanised staples (T50) at least 10mm wide with 8mm legs every 100 to 150mm along the top, in the area the shiplap will cover and above the connect zone.
- Roll out the next layer straight and shiplapped, making sure the 3D mesh does not cover the overlap.
- With the overlap dry and clean, fold the lapped membrane up, remove the release paper and press it down firmly in sections, free of tension and creases.
- Press the adhesive joint firmly; the amount of pressure, not its duration, sets the final bond strength.
- At vertical butt joints, pull back about 100mm of 3D mesh, cut off about 40 to 50mm of it and staple the lower membrane in the overlap area.
- Fold the mesh back and tape the overlap centrally with TESCON EXTORA, covering all staples, and press it with PRESSFIX.
- In valleys, lay a continuous layer of SOLITEX MENTO or UM (mesh removed), fold the edges back 75mm and staple sparingly at 150mm spacings; use no other staples in valleys.
- Connect to the drip edge with DUPLEX or TESCON EXTORA, and use TESCON EXTORA at vertical interruptions such as dormers and walls.
- Check all joints and connections are taped and sealed before the roofing or cladding goes on.
- Where nail or screw fixings penetrate the membrane, for example under standing seam clips, use TESCON NAIDECK.
Below 10° roof pitch the guide requires horizontal application.
Insulation Installation - Do It Yourself
Many homeowners choose to install their own insulation. Done properly, it can be a rewarding DIY project that makes your home more comfortable and energy efficient. To get the best results, it’s important to install insulation batts correctly. Otherwise, gaps or compression can significantly reduce their performance. If you choose to take on the home insulation installation yourself, we strongly recommend that you familiarise yourself with the proper process. Make sure you check the relevant standards prior to commencing the installation.
Using a sharp knife, and a thin plank of wood as a guide, can make cutting insulation batts easier. Experienced insulation installers will often size up the cut with a glance and press the insulation against a vertical timber wall stud before cutting the batt to the desired width or length. This can save time, but care must be taken to ensure that you keep the knife blade well clear of any wiring or other appliances.
General install tips
DIY Install Tips for Beginners
The following principles of installing insulation will ensure the best possible performance from home insulation.
- Avoid gaps in insulation
- Do not compress bulk home insulation
- Allow clearance around appliances and fittings
- Protect your home insulation from contact with moisture
- Use a broom handle with a nail in the end to access hard to reach areas
- Provide vapour and moisture barriers to prevent condensation
Improve the Thermal Performance of Home Insulation
- Fit batts snugly leaving no gaps around ducts and pipes
- Make sure corners, junctions of wall-floor-ceiling are fully covered
- Isolate metal framing from contact with cladding
- Insulate window frames or install windows with thermal breaks
Home Insulation Clearance Requirements
Some appliances and fittings, such as recessed downlights and heater flues, require free space around them for the dissipation of heat, to reduce fire hazard. Insulation should not be placed against these fixtures.
- Recessed downlights – Minimum clearance of 100mm (200mm for halogen downlights), and 50mm from the transformer or driver, unless the rating marked on the fitting allows less
- Flues and exhaust fans – Minimum clearance of 25mm
- Electrical wiring – Keep wiring clear of insulation (check with electrician before installing insulation)
Condensation
Home insulation, correctly installed, can keep the interior surface temperature of ceilings and external walls above the dewpoint, preventing condensation on these surfaces. Condensation control involves preventing moist air from coming into contact with cold surfaces below the dewpoint of the air by one or more of the following means:
- Good ventilation of the moisture-laden air.
- Insulation to keep ceiling and wall temperatures above dewpoint.
- Heating to prevent indoor surfaces from cooling below the dewpoint.
Protect Insulation from Contact with Moisture
Masonry walls are not waterproof. In both brick veneer and double-brick wall construction a cavity between the external masonry wall and the internal lining keeps the internal lining dry. Moisture on the internal face of the external masonry wall can drain away through weepholes or evaporate into the cavity.
- Brick veneer construction – make sure the insulation remains within the frame. Use reflective foil, galvanized wire or building paper to keep the bulk insulation in place.
- Cavity masonry walls – restrain bulk insulation to maintain at least 30mm cavity.
- Existing wall cavities – use ‘cavity fill’ water-repellent loose-fill granular rockwool insulation. This material contains a water repelling agent to prevent absorption of moisture.
Sealed Air Space with Reflective Foil
- Reflective insulation adjacent to a solid surface without an airspace, has no insulative value and acts only as a vapour barrier. To add thermal resistance, reflective insulation must face a sealed air space.
- Maintain a sealed air space of at least 25 mm.
- Eliminate air movement between air spaces on either side of the foil.
- Overlap sheets by 150 mm and tape over joins; seal any gaps.
- Use face-of-wall brick ties instead of ties which penetrate the foil.
- Reflective surfaces should be kept clean and dust free, vertical installation is best for this.
Insulation Installation – Clearance Around Appliances and Fittings
Caution When Using Foil Products
- Keep foil products away from electrical power outlets or lights as they can conduct electricity through the aluminium metal reflective covering.
- Care must also be taken when installing under metal or tile roofs.
Wear Protective Clothing Before You Insulate
- When installing insulation in the roof space, it’s recommended to wear goggles, a dust mask, gloves, long pants and a long sleeve shirt.
Install instructions
How to install ceiling insulation
Do not start work until the site is safe!
Insulation batts installation - all work must be completed to the requirements of relevant standard: AS3999:1992
Step 1
- Ensure you have the right product for the application for your roof insulation installation. Check that you have the correct R-Value required on the drawings/plans.
- Check the joist width to determine the correct insulation batt width. (e.g. 430mm or 580mm)
Start from the furthest point, ensuring the top plate (top of the wall) is covered and work back towards the access hatch of the ceiling. - When installing, energise each batt by giving it a light shake and gently bouncing it on its side, to help the batt expand to the thickness specified on the label. Remember: the best house insulation performance will be achieved by following the manufacturers guidelines.
Step 2
- The insulation may be trimmed to appropriate sizes if required.
- Make sure when installing roof insulation that you leave sufficient clearances around recessed lights, extractor fans, chimney elements and piping as appropriate.
- Where possible, place insulation under electrical cables and ductwork.
- Use any off-cuts to fill voids.
- Glue or fix insulation to the back of the access lid or hatch.
Step 3
- Always make sure your insulation has a snug fit, with a uniform finished height of insulation. Check tips and tricks for good techniques in achieving this.
Step 4
- Once you have completed installing your home insulation, make sure you keep a copy of the product specification together with the documentation of your house.
How to install wall insulation
Do not commence installing insulation until the site is safe!
Installation must be completed to the requirements of relevant standard: AS3999-1992
Step 1
- Ensure you have the right product for the application. Check that you have the correct R-Value required on the drawings/plans.
- Check the joist width to determine the correct insulation batt width. (e.g. 430mm or 580mm)
Work progressively around the perimeter of the building/room. - When installing, energise each batt by giving it a light shake and gently bouncing it on its side, to help the batt expand to the thickness specified on the label.
Step 2
- The insulation may be trimmed to appropriate sizes if required. When cutting* to fill a void, oversize by around 10mm to ensure a snug fit. Do not leave folds or compress the insulation material.
- Fill gaps around lintels, double framing, windows and doors with off-cuts.
- Trim and place product around vents to allow ventilation systems to operate as intended.
- Shape and fit insulation behind electrical wiring and plumbing work.
- Use string to hold in place (if required).
- Ensure insulation does not protrude beyond the line of the studs.
Step 3
- Always make sure your insulation has a snug fit, with a uniform finished height. Check tips and tricks for good techniques in achieving this.
Step 4
- Once you have completed your insulation installation make sure you keep a copy of the product specification with the documentation of your house.
How to install underfloor insulation
Do not start work until the site is safe!
Insulation installation must be completed to the requirements of relevant standard: AS3999:1992
Step 1
- Ensure you have the right product for the application. Check that you have the correct R-Value required on the drawings/plans.
- Check the joist width to determine the correct insulation batt width. (e.g. 430mm or 580mm)
The insulation should always be fitted with strapping. - If fitted to fold down, the fold should be no more than 75mm below the bottom of the product.
- Start from the furthest point ensuring the bottom plate is covered and work back towards the access entrance of the underfloor.
- When installing, energise each batt by giving it a light shake and gently bouncing it on its side, to help the batt expand to the thickness specified on the label.
Step 2
- The insulation may be trimmed to appropriate sizes if required.
- Install the insulation in accordance with AS3999:1992, ensuring appropriate clearances from recessed lights, plumbing, extractor fans, chimney elements and piping.
- Refer to relevant standard for guidance regarding placement of insulation and stapling around electrical wiring.
- EXTREME CAUTION REQUIRED. If insulation is covering any wires, apply the Electrical Hazard labels at that point
Step 3
- Place long edge side of the insulation first neatly into the joist/underside of floor intersection
- Pressure fit the body of the insulation flush up under the floor
- Fold the opposite edge down so that a snug fit is achieved
- Leave no gaps between the insulation and the framing and the underside of the floor
- Fix strapping across the underside of the insulation batt
- Each insulation batt should have three runs of strapping applied, one at approx. 100mm from each end and one diagonal or across the centre of the insulation batt.
- Always ensure the insulation has a snug fit. Refer to the tips and tricks for techniques to reach tight spaces.
Step 4
- Once you have finished installing the insulation make sure you keep a copy of the product specification with the documentation of your house.
Top tips and tricks
Preload the ceiling before plastering
If you are building a new home it is a good idea to get the insulation above the ceiling before the roof space is enclosed.
For hard to reach areas, use a broom handle with a nail through the tip to spike the batt and position it.
You need ventilation while you work. If the roof is tiled, kick back some tiles for ventilation.
Try to avoid installing on a hot day, but if you are start nice and early and drink plenty of water throughout the day.
Use thick plywood or a wooden plank to support yourself over the ceiling rafters. This is more comfortable for your knees than kneeling on the rafters.
Knauf Insulation Earthwool Insulation is a new generation of softer, safer and more environmentally friendly glasswool insulation specifically designed for DIY installation.
We don't have an installation guide for this product yet. Need a hand? Call 1300 729 639.
We deliver to homes and building sites right across Australia. Choose your preferred delivery date at the online checkout and we'll confirm the same business day.
Full delivery & pickup info →We collect verified reviews on Trustpilot across all our products and service.
Read all on Trustpilot →Similar options for this application, compared on price per m² and R-value.
Pro Clima Pressfix XL Pressing Tool
Pro Clima Solitex Extasana Wrap
- Class 4 vapour permeable, water and air barrier (AS 4200.1)
- Up to 180 days UV exposure before cladding
Pro Clima Solitex Mento Plus Wrap
- Class 4 vapour permeable roof underlay, water and air barrier (AS 4200.1)
- Up to 180 days UV exposure (ASTM G155)
Pro Clima Intello Plus Air Barrier Wrap
- Interior air barrier that still lets the structure breathe, controlling moisture and draughts
- Intelligent vapour control that helps protect the build-up from condensation
