Pro Clima Tescon® Naideck Mono Self-Sealing Patches

Get 15% off as a trade customer. Open an instant trade account
Location Victoria
$249.05
per roll inc GST

We do not hold stock for your state. Tell us what you need and we will quote you on product and delivery.

4.9 from 590 Trustpilot reviews Delivery in 1 to 2 business days Secure checkout
  • Airtight seal around cables and pipes where leaks usually happen
Rather not install it yourself? See our installation service.
Prefer to order by phone? Call 1300 729 639

Pro Clima Tescon® Naideck Mono Self-Sealing Patches

Pro Clima Tescon® Naideck Mono Patches provide a self-sealing butyl solution designed for application on your weather-resistant barrier. These patches are an effective option for sealing penetrations like screws, nails, or other fasteners that need to pass through the membrane.

Benefits of Tescon® Naideck Mono Patches

  • Self-seals around screws, nails and other penetrations
  • Pre-cut patches for fast install
  • Reduces product usage by only applying where penetrations occur
  • Compatible with all pro clima WRB systems

5 Tips on Installing Pro Clima

Related Products

1
Technical data
BrandPro Clima
Pack contents300 patches per roll, each 86 mm x 62 mm
Thickness1.1 mm
CarrierPE film
AdhesiveButyl rubber modified with acrylate
Application temperature-10 °C to 35 °C
Service temperature-40 °C to 80 °C
UV exposure6 months, installed under the counter battens
ColourBlack film, grey butyl

Step by step

Summarised from the pro clima TESCON NAIDECK mono patch, Installation instructions (Australia, Version 99827 dated 23 Oct 2026). Work from the full guide: it has the drawings and every detail. Open the full guide (PDF)

1Prepare the surface
  • Clean the surface before sticking; the patch will not adhere to frozen surfaces.
  • Keep it free of water-repellent substances such as grease or silicone, and make sure it is dry and stable.
  • Pre-treating the surface with TESCON PRIMER improves the bond.
2Take a patch off the roll
  • The release paper protrudes on all sides, so each patch comes off the roll quickly and cleanly.
3Stick the patch in place
  • Position the patch in the middle of the counter batten, or on the SOLITEX underlay membrane, and stick it in place.
  • Rub the patch firmly into place; the PRESSFIX tool makes this kinder to your hands.
4Fasten the batten
  • Put the counter batten in place and fasten it with nails or screws.
  • The patch must lie flat on the exterior membrane with sufficient pressure; its butyl adhesive is pulled into the hole made by the nail or screw and seals it.
5Lay the membrane flat
  • Perforation seals only work on underlay membranes installed with no folds or creases.

The data sheet adds: apply at -10 °C to 35 °C; UV stable for 6 months when installed under the counter battens.

Delivery & pickup
Delivery1 to 2 business days
Delivery costFrom $99 metro, priced by postcode
Delivery dateChoose yours in the cart
Warehouse pickupVIC, NSW, QLD, SA and ACT
ReturnsWithin 30 days
Need it today?Ask us about same day delivery on 1300 729 639

We deliver to homes and building sites right across Australia. Choose your preferred delivery date at the online checkout and we'll confirm the same business day.

Full delivery & pickup info →
4.9 from 590 Trustpilot reviews

We collect verified reviews on Trustpilot across all our products and service.

Read all on Trustpilot →