  • Class 4 vapour permeable, water and air barrier (AS 4200.1)
  • Up to 180 days UV exposure before cladding
  • Suitable up to and including BAL FZ (AS 3959)
Rather not install it yourself? See our installation service.
Prefer to order by phone? Call 1300 729 639

Pro Clima Solitex Extasana® Wrap

Pro Clima Solitex Extasana is intended for installation behind various standard wall cladding systems, such as cavity brick, fibre-cement, masonry, and other frequently used wall constructions. Pro Clima Solitex Extasana® is a UV-stabilised and durable weather-resistant barrier engineered with a non-permeable, waterproof TEEE film that is securely bonded between two layers of spun-bonded polypropylene at elevated temperatures. This vapour permeable wall wrap is suitable for use in BAL regions up to and including BAL-FZ, in accordance with AS 3959.

Benefits of Pro Clima Solitex Extasana® Vapour Permeable Wall Wrap

  • 180 days UV resistance & long-term durability
  • Highly vapour permeable (Class 4)
  • Weathertight & airtight weather resistive barrier (WRB)
  • Next generation non-porous monolithic technology

5 Tips on Installing Pro Clima

Related Products

1
Technical data
BrandPro Clima
Vapour permeance classClass 4, vapour permeable (AS 4200.1); 2.179 µg/N·s (ASTM E96 Method B)
Water barrierWater barrier (AS 4200.1)
Air barrierAir barrier (AS 4200.1)
UV exposureUp to 180 days before cladding (ASTM G155)
Bushfire useUp to and including BAL FZ (AS 3959)
Flammability index< 5 (AS 1530.2)
Roll sizes
LengthWidthAreaWeight per roll
50 m1.50 m75 m²11.6 kg
36.5 m2.74 m100 m²16 kg

Delivery form as listed on the pro clima data sheet.

Your job

Timber frame

Summarised from the SOLITEX EXTASANA Application & Fixing Guide, Timber Frame (AUS, 03.06.2021). Work from the full guide: it has the drawings and every detail. Open the full guide (PDF)

1Prepare the framing
  • Make sure all studs are aligned and free from splinters, and check for nails, metal strapping or sharp framing edges that could wear through the membrane.
  • Mark where the top edge of the membrane will go to get a suitable overlap onto the slab edge or flashing.
2Fix the first layer
  • Apply 5 to 6 staples in one top corner, unroll the membrane over the studs, pull it taut and fix the opposite top corner with 5 to 6 staples.
  • Pull the membrane down taut at the centre and fix it with 2 to 3 staples at the bottom edge, then fix each bottom corner with 2 to 3 staples.
3Staple the top edge
  • Fix the membrane at each stud along the top edge with staples within 150 mm of the edge.
  • Use galvanised or stainless steel staples at least 10 mm wide and at least 1.3 mm thick.
4Overlap and tape the layers
  • Apply each following layer in an upside-down sequence compared to the bottom layer, overlapping by 150 mm along the printed white line.
  • Tape the horizontal joints with at least TESCON EXTORA 60 mm, 30 mm onto each side of the joint, and press it with the PRESSFIX tool.
5Dress the window openings
  • Cut the membrane at the window reveals with 45° cuts to form 4 flaps, fold them into the reveal and cut them flush with the back edge of the framing.
  • Staple the flaps at the rear edge of the reveal at 150 mm centres.
  • Cover exposed framing at the corners of the sill with TESCON EXTOSEAL sill tape.
6Form square corners
  • Use a new piece of membrane on each face of the building and avoid rounded corners, which make batten installation difficult.
  • Cut the second piece long enough to extend more than 50 mm around the corner, hold it with DUPLEX and press it into the corner with PRESSFIX.
  • Tape the joint on a flat section of wall away from the corner, never directly in the corner.
7Seal penetrations and staples
  • Fit a ROFLEX grommet of the correct size tightly over the pipe in a diamond orientation, then tape around it with TESCON EXTORA from the bottom edge, working anti-clockwise so upper layers lap over lower ones.
  • Patch all exposed staple holes with TESCON EXTORA.

The guide states SOLITEX EXTASANA can be installed according to AS 4200.2-2017 or as per the pro clima installation method in the guide.

Metal frame

Summarised from the SOLITEX EXTASANA Application & Fixing Guide, Metal Frame (AUS, 20.10.2021). Work from the full guide: it has the drawings and every detail. Open the full guide (PDF)

1Prepare the framing
  • Clean all sharp edges and burrs from the steel framing so the membrane is not damaged during installation or in service.
  • Measure and mark where the top edge of the membrane will be, allowing for the bottom edge flashing detail.
2Apply DUPLEX to the studs
  • Apply DUPLEX double-sided tape to the studs at suitable intervals, press it with PRESSFIX and remove the release paper.
  • DUPLEX only holds the membrane in place until the facade mounting system is installed; it is not a long-term fixing.
3Set the first layer
  • Pull the membrane taut along the top edge, adhering it to the DUPLEX as you go, then adhere the bottom edge at the centre while applying tension.
  • Pull taut and adhere the bottom corners, applying moderate pressure with the PRESSFIX tool.
4Overlap and tape the layers
  • Apply successive layers in an upside-down sequence with slight tension, overlapping 150 mm along the printed white line.
  • Tape the horizontal joints with at least TESCON EXTORA 60 mm and press it with the PRESSFIX tool.
5Dress the window openings
  • Cut the membrane at the reveals with 45° cuts to form 4 flaps, fix them into the reveal with DUPLEX at the rear edge and cut them flush with the back edge of the metal framing.
  • Cover exposed framing at the sill corners with TESCON EXTOSEAL, extending it at least 150 mm up the jambs.
6Seal fixings through the membrane
  • For brick veneer, hold the membrane temporarily with galvanised hex screws and washers at 300 mm centres before the brickwork.
  • Use TESCON NAIDECK to seal temporary fixings and other attachments fixed to the studs through the membrane.
Delivery & pickup
Delivery1 to 2 business days
Delivery costFrom $99 metro, priced by postcode
Delivery dateChoose yours in the cart
Warehouse pickupVIC, NSW, QLD, SA and ACT
ReturnsWithin 30 days
Need it today?Ask us about same day delivery on 1300 729 639

We deliver to homes and building sites right across Australia. Choose your preferred delivery date at the online checkout and we'll confirm the same business day.

Full delivery & pickup info →
4.9 from 590 Trustpilot reviews

We collect verified reviews on Trustpilot across all our products and service.

Read all on Trustpilot →