15mm Foilboard GREEN 15 Rigid PanelsR0.39 | 15.0 mm
15mm Foilboard Insulation
Foilboard Green Rigid Insulated Panels are designed for use in walls, floors and roofs. These insulation boards are made in Australia from a fire retardant expanded polystyrene core (FR-EPS) with pure aluminium foil directly laminated to both sides. Three main features were achieved creating Foilboard:- Superior Insulate
- Thermal Break
- Non-permeable Moisture Barrier
Benefits of Foilboard 15mm Insulation Panels
- Increases thermal efficiency of the building
- Reduction in energy usage and therefore an increase in energy savings
- Foilboard 15mm Insulation Panels are impervious to moisture
- An insulated panel can be Installed without gaps
- Lightweight and fast to install foil insulation board
- Achieves high R-values without the need for reengineering the building’s design
- Fire retardant insulation panel
- Formaldehyde, CFC & HCFC free
- The insulated panels have Zero Volatile Organic Compounds (VOC’s)
- 100% Australia made and owned
What is the difference between rigid insulation sheets and batts?
Foilboard® GREEN rigid board insulation will maintain the same thermal performance (R-value) for the life of the insulation panel. It will not sag and it will not delaminate. Foilboard® Australia backs its Foilboard® GREEN with a 25 year performance guarantee. Fully endorsed by Standards Australia, the Foilboard® GREEN rigid insulation panel is the premium insulation product in its market, both in manufactured quality and product performance and that is why it is backed by a 25 year performance guarantee. This durable rigid panel is specifically designed to achieve exceptionally high thermal values, making it the ideal product. Unlike traditional bulk insulation and blankets, this rigid panel will not shrink, sag or droop, ensuring that the building performs to its optimal thermal value from day one, to year 25 and beyond. The insulation board cost depends largely on its R-value (also known as R-rating) however bulk order discounts are also available.Foilboard Installation Guides
Foilboard Insulation is designed for a range of applications including walls, ceilings and underfloor areas. Click on the links below to learn how to install Foilboard Insulation in different applications.- Brick Veneer Walls
- Cladded Walls
- Brick Cavity Walls (Double Brick)
- Blockwork and Concrete Walls
- Commercial Suspended Ceilings
- Suspended Slab
- Cathedral or Skillion Roofs
- Panel Lift Garage Door
- Shed or Garage
- Underfloor using Saddles
- Underfloor Retro-fit using Flexifast Fasteners
- Underfloor Retro-fit using Standard Fasteners
Request a quote
15mm Foilboard GREEN 15 Rigid Panels
Thanks, your request is on its way.
We’ll get back to you with pricing within one business hour.
PDF, opens in a new tab Installation guide (Brick veneer walls)
PDF, opens in a new tab Installation guide (Cladded walls)
PDF, opens in a new tab Installation guide (Double brick cavity walls)
PDF, opens in a new tab Installation guide (Concrete or blockwork walls, single airspace)
PDF, opens in a new tab Installation guide (Commercial suspended ceiling)
PDF, opens in a new tab Installation guide (Suspended slab)
PDF, opens in a new tab Installation guide (Cathedral or skillion roofs)
PDF, opens in a new tab Installation guide (Garage door)
PDF, opens in a new tab Installation guide (Large shed)
PDF, opens in a new tab Installation guide (Underfloor with saddles)
PDF, opens in a new tab Installation guide (Underfloor with Flexifast)
PDF, opens in a new tab Installation guide (Underfloor retrofit)
PDF, opens in a new tab Installation guide (Cladded walls, double batten)
PDF, opens in a new tab Installation guide (Concrete or blockwork walls, dual airspace)
PDF, opens in a new tab Installation guide (Small shed)
PDF, opens in a new tab Installation guide (Pergola or veranda)
PDF, opens in a new tab Handling and storage guide
PDF, opens in a new tab Technical data and design guide
PDF, opens in a new tab Safety data sheet
PDF, opens in a new tab Product certificate (AS/NZS 4859.1)
PDF, opens in a new tab Fire test report (AS/NZS 1530.3)
PDF, opens in a new tab Warranty
PDF, opens in a new tab
Brick veneer walls
Summarised from the Foilboard Installation Guide, Brick Veneer, Timber or Steel Frame (V0126, January 2026). Work from the full guide: it has the drawings and every detail. Open the full guide (PDF)
- Install Foilboard once the framing, windows and plumbing are complete, but before electrical work.
- In windy conditions, start on the windward side first.
- Measure the required area, then mark the Foilboard panel before cutting to size.
- Use full sized sheets where possible, working from the top of the build down, and cut smaller sections with a straight edge.
- Position the panel against the outside of the studwork with the anti-glare side facing out, taking care not to leave gaps.
- Panels do not need to join over studs.
- Fasten the panel to the studwork with Foilboard fasteners, using 4 to 6 fasteners per square metre.
- Use Foilboard Fasteners for Green 10 and 15, or Ultra Fasteners for Green 20 and 25, in the timber or steel version to suit the frame.
- Tape any joins, exposed edges or gaps with Foilboard green joining tape.
- Fill the remaining areas with off-cuts to minimise wastage.
Foilboard panels contain aluminium foil, which conducts electricity, so keep them clear of electrical wiring and refer to AS 3999 or a licensed electrician. Replace, paint or cover any skylight or glass above or beside the panels before installing.
Cladded walls
Summarised from the Foilboard Installation Guide, Cladded Walls, Timber or Steel Frame (V0126, January 2026). Work from the full guide: it has the drawings and every detail. Open the full guide (PDF)
- Install Foilboard once the framing, windows and plumbing are complete, but before electrical work and cladding.
- In windy conditions, start on the windward side first.
- Measure the required area, then mark the Foilboard panel before cutting to size.
- Use full sized sheets where possible, working from the top of the build down, and cut smaller sections with a straight edge.
- Position the panel against the outside of the studwork with the anti-glare side facing out, taking care not to leave gaps.
- Panels do not need to join over studs.
- Fasten the panel to the studwork with Foilboard fasteners, using 4 to 6 fasteners per square metre.
- Use Foilboard Fasteners for Green 10 and 15, or Ultra Fasteners for Green 20 and 25, in the timber or steel version to suit the frame.
- Tape any joins, exposed edges or gaps with Foilboard joining tape.
- Fill the remaining areas with off-cuts to minimise wastage.
Foilboard panels contain aluminium foil, which conducts electricity, so keep them clear of electrical wiring and refer to AS 3999 or a licensed electrician. Replace, paint or cover any skylight or glass above or beside the panels before installing.
Double brick cavity walls
Summarised from the Foilboard Installation Guide, Double Brick Cavity (V0126, January 2026). Work from the full guide: it has the drawings and every detail. Open the full guide (PDF)
- Once the inner brick wall is built, push a Foilboard spacer block onto each brick tie.
- Use full sized sheets where possible, starting from the top and working down.
- For smaller sections, measure the area and cut with a straight edge, using off-cuts to minimise wastage.
- Gently press the Foilboard panel onto the brick ties so they leave a mark showing their position.
- Cut a slot where each brick tie marked the panel.
- Push the panel onto the brick ties until it meets the spacer blocks.
- Tape any joins, exposed edges or gaps with Foilboard joining tape.
- Tape around the brick ties as well, for the best thermal performance.
- Once the panels are installed, finish the outer skin of the brickwork.
Foilboard panels contain aluminium foil, which conducts electricity, so keep them clear of electrical wiring and refer to AS 3999 or a licensed electrician. Replace, paint or cover any skylight or glass above or beside the panels before installing.
Concrete or blockwork walls, single airspace
Summarised from the Foilboard Installation Guide, Concrete Wall, Single Airspace (V0126, January 2026). Work from the full guide: it has the drawings and every detail. Open the full guide (PDF)
- Install the furring clips onto the concrete or blockwork wall.
- For a higher R-value, consider the dual airspace method instead.
- Use full sized sheets in the largest areas, working from the top of the wall down.
- For smaller sections, measure the area and cut with a straight edge, using off-cuts to minimise wastage.
- Apply gentle pressure to the panel over the furring clips to leave visible marks.
- Cut a slot where each furring clip left a mark.
- Push the panel over the clips until it meets the concrete wall.
- Lock the panels in place with the furring channels.
- Tape any joins, exposed edges or gaps with Foilboard joining tape.
Foilboard panels contain aluminium foil, which conducts electricity, so keep them clear of electrical wiring and refer to AS 3999 or a licensed electrician. Replace, paint or cover any skylight or glass above or beside the panels before installing.
Concrete or blockwork walls, dual airspace
Summarised from the Foilboard Installation Guide, Concrete Wall, Dual Airspace (V0126, January 2026). Work from the full guide: it has the drawings and every detail. Open the full guide (PDF)
- Install the furring clips onto the concrete or blockwork wall.
- Cut Foilboard spacer blocks and fit one to one side of each clip.
- Use full sized sheets in the largest areas, working from the top of the wall down.
- For smaller sections, measure the area and cut with a straight edge, using off-cuts to minimise wastage.
- Apply gentle pressure to the panel over the furring clips to leave visible marks.
- Cut a slot where each furring clip left a mark.
- Push the panel onto the clips until it meets the spacer blocks.
- Lock the panels in place with the furring channels.
- Tape any joins, exposed edges or gaps with Foilboard joining tape.
Foilboard panels contain aluminium foil, which conducts electricity, so keep them clear of electrical wiring and refer to AS 3999 or a licensed electrician. Replace, paint or cover any skylight or glass above or beside the panels before installing.
Cathedral or skillion roofs
Summarised from the Foilboard Installation Guide, Roof, Cathedral or Skillion, Retrofit (V0126, January 2026). Work from the full guide: it has the drawings and every detail. Open the full guide (PDF)
- Measure the required area, then mark the Foilboard panel before cutting.
- Add 2 mm to each measurement for a snug fit that allows for slight variation between the rafters.
- Cut the panel to size with a straight edge and a sharp knife.
- Attach Foilboard Flexifast fasteners to the edges of the panel, 300 mm from the end and at 600 mm intervals.
- Position the panel between the rafters and fix it with the Flexifast fasteners.
- Tape any joins, exposed edges or gaps with Foilboard joining tape, and seal minor gaps with a high temperature, neutral cure silicone.
- Plaster to finish.
Foilboard panels contain aluminium foil, which conducts electricity, so keep them clear of electrical wiring and refer to AS 3999 or a licensed electrician. Replace, paint or cover any skylight or glass above or beside the panels before installing.
Commercial suspended ceiling
Summarised from the Foilboard Installation Guide, Commercial Ceiling, Suspended (V0126, January 2026). Work from the full guide: it has the drawings and every detail. Open the full guide (PDF)
- Position full sized Foilboard panels against the underside of the roof purlins with the anti-glare side facing out.
- Start with full panels in the largest areas.
- Fasten the panels to the purlins with Foilboard fasteners, using 5 or 6 per square metre.
- Use Foilboard Fasteners for Green 10 and 15, or Ultra Fasteners for Green 20 and 25, in the timber or steel version to suit the frame.
- Measure the remaining areas, then cut panels to size with a straight edge and a sharp knife.
- Make sure the panels fit snugly, and use off-cuts to minimise wastage.
- Tape any joins, exposed edges or gaps with Foilboard joining tape.
- Seal minor gaps with a high temperature, neutral cure silicone.
Foilboard panels contain aluminium foil, which conducts electricity, so keep them clear of electrical wiring and refer to AS 3999 or a licensed electrician. Replace, paint or cover any skylight or glass above or beside the panels before installing.
Suspended concrete slab
Summarised from the Foilboard Installation Guide, Slab, Suspended (V0126, January 2026). Work from the full guide: it has the drawings and every detail. Open the full guide (PDF)
- Position full sized Foilboard panels against the underside of the concrete slab.
- Start with the areas that take full sheets before moving to smaller areas.
- Fasten each panel with mechanical fasteners, such as concrete anchors or Foilboard blank screw plates with nylon screws.
- Measure the remaining areas, then cut panels to size with a straight edge and a sharp knife.
- Use off-cuts wherever possible to minimise wastage.
- Tape any joins, exposed edges or gaps with Foilboard joining tape.
- Seal minor gaps with a high temperature, neutral cure silicone.
Foilboard panels contain aluminium foil, which conducts electricity, so keep them clear of electrical wiring and refer to AS 3999 or a licensed electrician. Replace, paint or cover any skylight or glass above or beside the panels before installing.
Underfloor with saddles (Green 10, 15 and 20)
Summarised from the Foilboard Installation Guide, Underfloor, Saddle, New Build (V0126, January 2026). Work from the full guide: it has the drawings and every detail. Open the full guide (PDF)
- Measure the distance between the joists and cut the panel to size with a straight edge and a sharp knife.
- Add 2 mm to each measurement for a snug fit, and cut across the panel width so each piece is 1200 mm long.
- Place Foilboard floor saddles along the joists, starting 300 mm from the ends and spaced at 600 mm intervals.
- The saddles suit Green 10, 15 and 20 panels, and can be stapled or nailed if required.
- Push the panels firmly into place from above, so they sit between the base and top flap of the saddle.
- The anti-glare side typically faces up in this application.
- Enclose the airspace by sealing the ends of the joist cavities with more Foilboard panel pieces.
- Tape any joins, exposed edges or gaps with Foilboard joining tape, so the reflective air space is fully enclosed.
Foilboard panels contain aluminium foil, which conducts electricity, so keep them clear of electrical wiring and refer to AS 3999 or a licensed electrician. Replace, paint or cover any skylight or glass above or beside the panels before installing.
Underfloor with Flexifast fasteners
Summarised from the Foilboard Installation Guide, Underfloor, Flexifit (V0126, January 2026). Work from the full guide: it has the drawings and every detail. Open the full guide (PDF)
- Measure the required area between the joists and mark the panel.
- Add 2 mm to each measurement for a snug fit, and cut across the panel width so each piece is 1200 mm long.
- Cut the panel to size with a straight edge and a sharp knife.
- Attach Foilboard Flexifast fasteners to the edges of the panel, 300 mm from the end and at 600 mm intervals.
- Position the panel between the joists and fix it in place with the Flexifast fasteners.
- The anti-glare side typically faces up in this application.
- Tape any joins, exposed edges or gaps with Foilboard joining tape, so the reflective air space is enclosed.
- Seal minor gaps with a high temperature, neutral cure silicone.
Foilboard panels contain aluminium foil, which conducts electricity, so keep them clear of electrical wiring and refer to AS 3999 or a licensed electrician. Replace, paint or cover any skylight or glass above or beside the panels before installing.
Underfloor retrofit, under the joists
Summarised from the Foilboard Installation Guide, Underfloor, Retrofit (V0126, January 2026). Work from the full guide: it has the drawings and every detail. Open the full guide (PDF)
- Position a full sized panel underneath the joists with one edge butting against the bearer.
- The anti-glare side typically faces down in this application.
- Fix the panel with 3 Foilboard fasteners per joist.
- Foilboard recommends 12 to 16 fasteners per panel, depending on its orientation on the joists.
- Use Foilboard Fasteners for Green 10 and 15 or Ultra Fasteners for Green 20 and 25 (timber or steel), or Foilboard Blank Plates.
- Measure the remaining areas and cut panels to size with a straight edge and a sharp knife.
- Cut panels to fit around services as needed, using off-cuts to minimise wastage.
- Tape any joins, exposed edges or gaps with Foilboard joining tape, so the reflective air space is enclosed.
- Panels can join mid span with joining tape, and minor gaps can be sealed with a high temperature, neutral cure silicone.
Foilboard panels contain aluminium foil, which conducts electricity, so keep them clear of electrical wiring and refer to AS 3999 or a licensed electrician. Replace, paint or cover any skylight or glass above or beside the panels before installing.
Garage door
Summarised from the Foilboard Installation Guide, Garage Door (V0126, January 2026). Work from the full guide: it has the drawings and every detail. Open the full guide (PDF)
- Insulate the internal face of the garage door.
- Make sure the surfaces are clean, dry and dust free.
- Attach Foilboard spacer blocks to the door surface with high temperature, neutral cure silicone.
- Space them evenly, 5 to 6 blocks per section.
- Measure and cut each panel to fit as close to the door framework as possible, using a straight edge and a sharp knife.
- Apply a small amount of adhesive or silicone to the spacer blocks, then slide each cut panel into the frame with the silver side facing out.
- Position the panels between the lip of the door framework and the spacer blocks, and allow the adhesive to cure.
- Tape any joins, exposed edges or gaps with Foilboard silver joining tape.
Foilboard panels contain aluminium foil, which conducts electricity, so keep them clear of electrical wiring and refer to AS 3999 or a licensed electrician. Replace, paint or cover any skylight or glass above or beside the panels before installing.
Small shed
Summarised from the Foilboard Installation Guide, Shed, Small Structure (V0126, January 2026). Work from the full guide: it has the drawings and every detail. Open the full guide (PDF)
- This method is for small sheds up to 2 m x 2 m without purlins or top hats, where building a frame for mechanical fixings is not feasible.
- Keep the air gap unventilated, with no wind tunnelling between the Foilboard and the shed sheeting.
- Measure the area to be insulated and use full sized sheets where possible.
- Cut smaller sections with a straight edge for precision.
- Clean the shed walls and roof so they are dry and dust free.
- Attach Foilboard spacer blocks to the metal with a high temperature, neutral cure silicone, following the silicone maker's instructions.
- Mount the panels onto the spacer blocks with more high temperature, neutral cure silicone, silver side facing out.
- Tape any joins, exposed edges or gaps with Foilboard joining tape.
- Do not install under a skylight.
Foilboard panels contain aluminium foil, which conducts electricity, so keep them clear of electrical wiring and refer to AS 3999 or a licensed electrician. Replace, paint or cover any skylight or glass above or beside the panels before installing.
Large shed roof, between purlins
Summarised from the Foilboard Installation Guide, Shed, Large Structure (V0126, January 2026), page 1. Work from the full guide: it has the drawings and every detail. Open the full guide (PDF)
- Measure the space between the purlins or top hats and cut the panel to size with a straight edge and a sharp knife.
- Push the Flexifast fastener spikes into the sides of the panel, starting 300 mm from the end and spaced 600 mm apart.
- Fit the panels between the purlins and secure them by screwing through the Flexifast fasteners.
- Tape any joins, exposed edges or gaps with Foilboard joining tape.
- In commercial sheds the ceiling lining is usually fixed directly to the purlins or top hats, over the Foilboard.
Foilboard panels contain aluminium foil, which conducts electricity, so keep them clear of electrical wiring and refer to AS 3999 or a licensed electrician. Replace, paint or cover any skylight or glass above or beside the panels before installing.
Large shed roof, under purlins
Summarised from the Foilboard Installation Guide, Shed, Large Structure (V0126, January 2026), page 2. Work from the full guide: it has the drawings and every detail. Open the full guide (PDF)
- Position full sized panels directly underneath the roof purlins or top hats.
- If required, cut the panel to size with a straight edge and a sharp knife.
- Fix the panel directly to the underside of the purlins or top hats with Foilboard fasteners or blank plates.
- The fasteners named in the guide are Foilboard Fasteners for Green 10 and 15, or Ultra Fasteners for Green 20 and 25.
- Tape any joins, exposed edges or gaps with Foilboard joining tape.
- Commercial sheds usually have battens installed over the Foilboard, followed by the ceiling lining.
Foilboard panels contain aluminium foil, which conducts electricity, so keep them clear of electrical wiring and refer to AS 3999 or a licensed electrician. Replace, paint or cover any skylight or glass above or beside the panels before installing.
Large shed walls, compression fit
Summarised from the Foilboard Installation Guide, Shed, Large Structure (V0126, January 2026), page 3. Work from the full guide: it has the drawings and every detail. Open the full guide (PDF)
- Measure the distance between the girts or top hats and add extra length at both ends, so the ends can fold back on themselves.
- Mark the panel at this extended length.
- Score the board along the marked lines with a sharp knife, without cutting through the front foil layer.
- Gently fold the scored sections backward to double the panel thickness at each end.
- Push the panel into position between the girts or top hats, compressing the folded ends at the top and bottom.
- Tape any exposed edges, joins or gaps with Foilboard joining tape.
Foilboard panels contain aluminium foil, which conducts electricity, so keep them clear of electrical wiring and refer to AS 3999 or a licensed electrician. Replace, paint or cover any skylight or glass above or beside the panels before installing.
Large shed walls, fixed to girts
Summarised from the Foilboard Installation Guide, Shed, Large Structure (V0126, January 2026), page 4. Work from the full guide: it has the drawings and every detail. Open the full guide (PDF)
- Measure the wall area between the structural elements and mark the panels before cutting.
- Cut the panels to size with a sharp knife and a straight edge.
- Fix the panels directly to the face of the wall girts with Foilboard fasteners or blank plates.
- Foilboard recommends fixing the panels mechanically.
- Tape all joins, exposed edges and gaps with Foilboard joining tape.
Foilboard panels contain aluminium foil, which conducts electricity, so keep them clear of electrical wiring and refer to AS 3999 or a licensed electrician. Replace, paint or cover any skylight or glass above or beside the panels before installing.
Pergola or veranda
Summarised from the Foilboard Installation Guide, Pergola / Veranda (V0126, January 2026). Work from the full guide: it has the drawings and every detail. Open the full guide (PDF)
- Paint or cover any clear roof sheeting before installation, to protect the panel underneath.
- Measure the required area and mark the panel, then cut it with a straight edge and a sharp knife.
- Start with full panels in the largest areas, then fill smaller areas with off-cuts.
- Position the panel against the underside of the battens, with one side butting up to the rafters.
- Fasten the panel to the battens with Foilboard fasteners, using 4 to 6 per square metre.
- Use Foilboard Fasteners for Green 10 and 15, or Ultra Fasteners for Green 20 and 25, in the timber or steel version to suit the frame.
- Tape any joins, exposed edges or gaps with Foilboard joining tape.
Foilboard panels contain aluminium foil, which conducts electricity, so keep them clear of electrical wiring and refer to AS 3999 or a licensed electrician. Replace, paint or cover any skylight or glass above or beside the panels before installing.
Insulation Installation - Do It Yourself
Many homeowners choose to install their own insulation. Done properly, it can be a rewarding DIY project that makes your home more comfortable and energy efficient. To get the best results, it’s important to install insulation batts correctly. Otherwise, their performance can be reduced by up to 50%. If you choose to take on the home insulation installation yourself, we strongly recommend that you familiarise yourself with the proper process. Make sure you check the relevant standards prior to commencing the installation.
Using a sharp knife, and a thin plank of wood as a guide, can make cutting insulation batts easier. Experienced insulation installers will often size up the cut with a glance and press the insulation against a vertical timber wall stud before cutting the batt to the desired width or length. This can save time, but care must be taken to ensure that you keep the knife blade well clear of any wiring or other appliances.
General install tips
DIY Install Tips for Beginners
The following principles of installing insulation will ensure the best possible performance from home insulation.
- Avoid gaps in insulation
- Do not compress bulk home insulation
- Allow clearance around appliances and fittings
- Protect your home insulation from contact with moisture
- Use a broom handle with a nail in the end to access hard to reach areas
- Provide vapour and moisture barriers to prevent condensation
Improve the Thermal Performance of Home Insulation
- Fit batts snugly leaving no gaps around ducts and pipes
- Make sure corners, junctions of wall-floor-ceiling are fully covered
- Isolate metal framing from contact with cladding
- Insulate window frames or install windows with thermal breaks
Home Insulation Clearance Requirements
Some appliances and fittings, such as recessed downlights and heater flues, require free space around them for the dissipation of heat, to reduce fire hazard. Insulation should not be placed against these fixtures.
- Recessed downlights – Minimum clearance of 25mm
- Flues and exhaust fans – Minimum clearance of 25mm
- Electrical wiring – Keep wiring clear of insulation (check with electrician before installing insulation)
Condensation
Home insulation, correctly installed, can keep the interior surface temperature of ceilings and external walls above the dewpoint, preventing condensation on these surfaces. Condensation control involves preventing moist air from coming into contact with cold surfaces below the dewpoint of the air by one or more of the following means:
- Good ventilation of the moisture-laden air.
- Insulation to keep ceiling and wall temperatures above dewpoint.
- Heating to prevent indoor surfaces from cooling below the dewpoint.
Protect Insulation from Contact with Moisture
Masonry walls are not waterproof. In both brick veneer and double-brick wall construction a cavity between the external masonry wall and the internal lining keeps the internal lining dry. Moisture on the internal face of the external masonry wall can drain away through weepholes or evaporate into the cavity.
- Brick veneer construction – make sure the insulation remains within the frame. Use reflective foil, galvanized wire or building paper to keep the bulk insulation in place.
- Cavity masonry walls – restrain bulk insulation to maintain at least 30mm cavity.
- Existing wall cavities – use ‘cavity fill’ water-repellent loose-fill granular rockwool insulation. This material contains a water repelling agent to prevent absorption of moisture.
Sealed Air Space with Reflective Foil
- Reflective insulation adjacent to a solid surface without an airspace, has no insulative value and acts only as a vapour barrier. To add thermal resistance, reflective insulation must face a sealed air space.
- Maintain a sealed air space of at least 25 mm.
- Eliminate air movement between air spaces on either side of the foil.
- Overlap sheets by 150 mm and tape over joins; seal any gaps.
- Use face-of-wall brick ties instead of ties which penetrate the foil.
- Reflective surfaces should be kept clean and dust free, vertical installation is best for this.
Insulation Installation – Clearance Around Appliances and Fittings
Caution When Using Foil Products
- Keep foil products away from electrical power outlets or lights as they can conduct electricity through the aluminium metal reflective covering.
- Care must also be taken when installing under metal or tile roofs.
Wear Protective Clothing Before You Insulate
- When installing insulation in the roof space, it’s recommended to wear goggles, a dust mask, gloves, long pants and a long sleeve shirt.
Install instructions
How to install ceiling insulation
Do not start work until the site is safe!
Insulation batts installation - all work must be completed to the requirements of relevant standard: AS3999:1992
Step 1
- Ensure you have the right product for the application for your roof insulation installation. Check that you have the correct R-Value required on the drawings/plans.
- Check the joist width to determine the correct insulation batt width. (e.g. 430mm or 580mm)
Start from the furthest point, ensuring the top plate (top of the wall) is covered and work back towards the access hatch of the ceiling. - When installing, energise each batt by giving it a light shake and gently bouncing it on its side, to help the batt expand to the thickness specified on the label. Remember: the best house insulation performance will be achieved by following the manufacturers guidelines.
Step 2
- The insulation may be trimmed to appropriate sizes if required.
- Make sure when installing roof insulation that you leave sufficient clearances around recessed lights, extractor fans, chimney elements and piping as appropriate.
- Where possible, place insulation under electrical cables and ductwork.
- Use any off-cuts to fill voids.
- Glue or fix insulation to the back of the access lid or hatch.
Step 3
- Always make sure your insulation has a snug fit, with a uniform finished height of insulation. Check tips and tricks for good techniques in achieving this.
Step 4
- Once you have completed installing your home insulation, make sure you keep a copy of the product specification together with the documentation of your house.
How to install wall insulation
Do not commence installing insulation until the site is safe!
Installation must be completed to the requirements of relevant standard: AS3999-1992
Step 1
- Ensure you have the right product for the application. Check that you have the correct R-Value required on the drawings/plans.
- Check the joist width to determine the correct insulation batt width. (e.g. 430mm or 580mm)
Work progressively around the perimeter of the building/room. - When installing, energise each batt by giving it a light shake and gently bouncing it on its side, to help the batt expand to the thickness specified on the label.
Step 2
- The insulation may be trimmed to appropriate sizes if required. When cutting* to fill a void, oversize by around 10mm to ensure a snug fit. Do not leave folds or compress the insulation material.
- Fill gaps around lintels, double framing, windows and doors with off-cuts.
- Trim and place product around vents to allow ventilation systems to operate as intended.
- Shape and fit insulation behind electrical wiring and plumbing work.
- Use string to hold in place (if required).
- Ensure insulation does not protrude beyond the line of the studs.
Step 3
- Always make sure your insulation has a snug fit, with a uniform finished height. Check tips and tricks for good techniques in achieving this.
Step 4
- Once you have completed your insulation installation make sure you keep a copy of the product specification with the documentation of your house.
How to install underfloor insulation
Do not start work until the site is safe!
Insulation installation must be completed to the requirements of relevant standard: AS3999:1992
Step 1
- Ensure you have the right product for the application. Check that you have the correct R-Value required on the drawings/plans.
- Check the joist width to determine the correct insulation batt width. (e.g. 430mm or 580mm)
The insulation should always be fitted with strapping. - If fitted to fold down the fold should be no more that 75mm below the bottom of the product.
- Start from the furthest point ensuring the bottom plate is covered and work back towards the access entrance of the underfloor.
- When installing, energise each batt by giving it a light shake and gently bouncing it on its side, to help the batt expand to the thickness specified on the label.
Step 2
- The insulation may be trimmed to appropriate sizes if required.
- Install the insulation in accordance with AS3999:1992, ensuring appropriate clearances from recessed lights, plumbing, extractor fans, chimney elements and piping.
- Refer to relevant standard for guidance regarding placement of insulation and stapling around electrical wiring.
- EXTREME CAUTION REQUIRED. If insulation is covering any wires, apply the Electrical Hazard labels at that point
Step 3
- Place long edge side of the insulation first neatly into the joist/underside of floor intersection
- Pressure fit the body of the insulation flush up under the floor
- Fold the opposite edge down so that a snug fit is achieved
- Leave no gaps between the insulation and the framing and the underside of the floor
- Fix strapping across the underside of the insulation batt
- Each insulation batt should have three runs of strapping applied, one at approx. 100mm from each end and one diagonal or across the centre of the insulation batt.
- Always ensure the insulation has a snug fit. Refer to the tips and tricks for techniques to reach tight spaces.
Step 4
- Once you have finished installing the insulation make sure you keep a copy of the product specification with the documentation of your house.
Top tips and tricks
Preload the ceiling before plastering
If you are building a new home it is a good idea to get the insulation above the ceiling before the roof space is enclosed.
For hard to reach areas, use a broom handle with a nail through the tip to spike the batt and position it.
You need ventilation while you work. If the roof is tiled, kick back some tiles for ventilation.
Try to avoid installing on a hot day, but if you are start nice and early and drink plenty of water throughout the day.
Use thick plywood or a wooden plank to support yourself over the ceiling rafters. This is more comfortable for your knees than kneeling on the rafters.
Knauf Insulation Earthwool Insulation is a new generation of softer, safer and more environmentally friendly glasswool insulation specifically designed for DIY installation.
We don't have an installation guide for this product yet. Need a hand? Call 1300 729 639.
We deliver to homes and building sites right across Australia. Choose your preferred delivery date at the online checkout and we'll confirm the same business day.
Full delivery & pickup info →Answer a few quick questions, or describe your job in your own words, and wAIse checks whether this R0.39 product fits and compares it with two alternatives.
We collect verified reviews on Trustpilot across all our products and service.
Read all on Trustpilot →Similar options for this application, compared on price per m² and R-value.