Bradford Optimo Saddles

Get 15% off as a trade customer. Open an instant trade account
Location Victoria
To Fit R2.5 Optimo
$202.50
per pack inc GST

We do not hold stock for your state. Tell us what you need and we will quote you on product and delivery.

4.9 from 590 Trustpilot reviews Delivery in 1 to 2 business days Secure checkout
  • Non-combustible mineral wool that will not add fuel to a fire
  • Designed for underfloor insulation
  • Trusted Bradford quality
  • Glasswool can itch while you handle it. Knauf Earthwool is noticeably softer to work with.
Rather not install it yourself? See our installation service.
Prefer to order by phone? Call 1300 729 639

Bradford Optimo Saddles - For New Builds

Bradford Optimo underfloor insulation is easy to install during the build process. Optimo Saddles are designed to hold underfloor insulation in place in new build installations. Watch the step by step installation video to learn how Optimo can be installed from above, before the flooring is laid, in any new home or extension built on piers.

How to Install Bradford Optimo

1
Technical data
BrandBradford
MaterialGlasswool
Applicationunderfloor
FireNon-combustible AS 1530.1
SuitsBradford Optimo R2.5 underfloor batts, 90 mm thick, 415 or 565 mm wide; 45 mm wide framing only
Pack contents250 per box
Coverage per box53 m² with 415 mm batts, 75 m² with 565 mm batts
FixingStaple fixing, saddles no more than 500 mm apart
UV exposureDo not expose to UV and weather for extended periods

Step by step

Summarised from the Bradford Optimo Underfloor Insulation, Installation Instructions (undated; current file on csrbradford.com.au, checked 23-10-2026). Work from the full guide: it has the drawings and every detail. Open the full guide (PDF)

1Prepare the job
  • Switch off power at the fuse box.
  • Measure the joist spaces: use 415 mm wide Optimo batts for 450 mm centres and 565 mm wide batts for 600 mm centres, trimming batts with a knife if too wide.
  • Store the insulation where it is protected from damage and water, and install it dry.
2Fix the saddles
  • Install from above, before the floor is laid.
  • Place Optimo saddles across the joists no greater than 500 mm apart so each batt is supported from both sides, staggering the saddle positions from joist to joist.
  • Fasten each saddle with a staple, nail or screw.
3Fit the batts
  • Fit the batts tightly between the joists so they rest on the feet of the saddles.
  • Tuck the side edges down next to the joist so they do not get in the way of the flooring adhesive on the joist.
  • Do not leave gaps between the batts.
4Lay the floor
  • Install the flooring once the insulation is in place.
  • Take care not to block ventilation openings.

Bradford's Optimo Fixing Products technical statement adds: saddles suit 45 mm wide framing only, should not be exposed to UV and weather for extended periods, and should give at least two supports on each side of each batt.

Delivery & pickup
Delivery1 to 2 business days
Delivery costFrom $99 metro, priced by postcode
Delivery dateChoose yours in the cart
Warehouse pickupVIC, NSW, QLD, SA and ACT
ReturnsWithin 30 days
Need it today?Ask us about same day delivery on 1300 729 639

We deliver to homes and building sites right across Australia. Choose your preferred delivery date at the online checkout and we'll confirm the same business day.

Full delivery & pickup info →
4.9 from 590 Trustpilot reviews

We collect verified reviews on Trustpilot across all our products and service.

Read all on Trustpilot →